Contractor licence application checklist
Applications are rejected for missing paper far more often than for anything substantive. This is the list, numbered, printable, with the two jurisdictions whose extras we have read from source.
Tick as you collect. Print it and hand it to whoever keeps your paperwork — the checked state prints too.
0 of 14 collected
- § 1
- § 2
- § 3
- § 4
- § 5
- § 6
- § 7
- § 8
- § 9
- § 10
- § 11
- § 12
- § 13
- § 14
Your own additions
Anything your board asks for that is not above.
- § 1

§ 1What this covers
The twelve items every board state asks for, plus the extras that are genuinely jurisdiction-specific. It is a collection list, not a filing guide — the board’s own instructions govern the order and the forms.
§ 2Collect in this order
The list is numbered in the order that wastes the least money. Experience verification first, because it is the item most likely to be impossible later. The bond last, because premium spent while an exam result is pending is premium spent for nothing.
§ 3The jurisdiction extras
California adds two items for an LLC: a $100,000 employee and worker bond on top of the contractor bond (B&P Code § 7071.6.5), and liability insurance at a cumulative $1,000,000 floor rising to $5,000,000 (B&P Code § 7071.19).
North Carolina adds the limitation tier and the working-capital statement that goes with it — $17,000 at Limited through $150,000 at Unlimited, or the surety bond alternative.
Checked against
- CSLB — Limited Liability Company (LLC) licencesread 2026-09-04
- CSLB — Bond Requirements (SB 607, effective 2023-01-01)read 2026-09-04
- NCLBGC — Classifications and Limitationsread 2026-09-04
Not legal advice. Fees, bond amounts and deadlines are set by statute and change without notice — confirm with the board that issues your licence before you file.